CAMELS project is divided into the following five work packages
Work
Package No.
|
Work Package Title
|
Lead Contractor
|
Start Month
|
End Month
|
Deliverable
No.
|
WP1
|
Data
Harmonisation and Consolidation
|
Alterra
|
0
|
18
|
D1.1, D1.2, D1.3,
D1.4, D1.5
|
WP2
|
Model
Validation and Uncertainty Analysis
|
MPI-BGC
|
0
|
24
|
D2.1, D2.2
|
WP3
|
Modelling
of the
20th Century
Land Carbon Balance
|
CEA
|
12
|
36
|
D3.1, D3.2, D3.3
|
WP4
|
Development
of a
System for Carbon
Data Assimilation
|
MetO
|
12
|
36
|
D4.1, D4.2
|
WP5
|
Dissemination
of
Information
|
UNITUS
|
0
|
36
|
D5.1, D5.2, D5. |
CAMELS deliverables are listed below, organised by the year and month
when each deliverable is due. CAMELS project has begun in October 2002
and is funded by the EU for 3 years. The number, date, title and status,
are given for each deliverable. Links to reports are provided where
appropriate.
Deliverable No.
|
Deliverable Title
|
Delivery Month
|
Nature
|
Dissemination Level
|
D1.1
|
Biome-specific
datasets to drive and validate TEMs.
|
6
|
Da
|
Pu |
D1.2
|
Atmospheric
CO2 dataset for use in nowcasting system.
|
9
|
Da
|
Pu |
D1.3
|
Land-use
and nitrogen deposition historical datasets (1900-2000).
|
12
|
Da
|
Pu |
D1.4
|
Datasets
of recent change in European land carbon.
|
15
|
Da
|
Pu |
D1.5
|
Dataset
of fAPAR for Europe
|
18
|
Da
|
Pu |
D2.1
|
Report
on improved process representation in TEMs.
|
18
|
Re
|
Pu |
D2.2
|
Biome-dependent
ecosystem parameters plus uncertainty bounds for each TEM
.
|
24
|
Da
|
Pu |
D3.1
|
Contemporary
carbon stores and TEM parameters constrained by 20th century
simulations.
|
24
|
Si
|
Pu |
D3.2
|
Simulations
of the historical land carbon balance, with and without land-use change.
|
30
|
Si
|
Pu |
D3.3
|
Diagnosis
of thecauses of the European land carbon sink in the context of the
Kyoto Proto.
|
36
|
Si
|
Pu |
D4.1
|
Report
on design of nowcasting carbon data assimilation system.
|
30
|
Re
|
Pu |
D4.2
|
Estimates
of the contemporary European land carbon sink, and its causes.
|
36
|
Si
|
Pu |
D5.1
|
Project
website with a layered structure.
|
3
|
Pr
|
Pu |
D5.2
|
Online
and ad hoc consultation to European Commission.
|
As
required
|
Expert
Advice
|
CO
|
D5.3
|
Report
on the estimation of the contemporary land carbon sink and its causes.
|
36
|
Re
|
Pu
|
Da =Data ; Re= Report; Si=Simulations ; Pr=Project website ;
Pu=Publication, CO= Coordination
|